Example

Production planning: Plans the shift cannot meet

Plans allow too little time for machine stops, so shifts fall short and material sits waiting.

Illustration of a plant: a storage area with racks and a forklift, and a production line with a planning board on the wall
The station that sets the line's pace is lit in blue; dashed outlines show the next shifts and the material they need.

SAROS · Past

SAROS shows output, machine stops and scrap by line, shift and product: what each shift really makes.

AZIMUTH · Future

AZIMUTH forecasts output, staffing and material for the coming shifts, so you can base the plan on what the line can make.

The data we use

Your production counts, machine stop log, scrap records, shift schedules and plans.

Where to start

One production line, measured against a target we set together.